Bridgestone Americas Warehouse
62,500 square feet
Design -Build, Pre-Engineered Metal Building
- Client: Bridgestone Americas
- Market: Industrial
- Location: Morrison, TN
- Facility: Warehousing
- Pre-Engineered Metal Building Manufacturer: Nucor
Building Specifications
- 62,500 square feet
- Standing seam roof
- PBR metal wall panels
- Liner Insulation System
- Mezzanine
- Office
- Crane system
- 7-month build time
What Was H.S. Williams’ Role in the Industrial Construction Project?
- The client needed expansion to keep up with growing supply chain demand and future production line expansions.
- H.S. Williams provided an experienced design team to fast-track design and fabrication for a warehouse needed to house incoming equipment.
- H.S. Williams provided project management, supervision, manpower and crews to complete the project in a reduced timeline.
- The finished product is a highly functional warehouse space with 12″ rebar reinforced slab to handle heavy production equipment and a crane system to assist in maneuvering materials and equipment in the warehouse.
Industrial Construction Challenges
- Consistent rains caused site issues and delays.
- Short timeline required multiple crews working extended hours and weekends to meet the schedule.
Plan Your Warehouse Construction with H.S. Williams Company
Do you need a similar pre-engineered metal building? Call us at 276-783-3185 or fill out the form below. We’re anxious to develop your custom plan!